Home 4. Implementing field trials General methodologies Site Implementation Plan blueprint

Site Implementation Plan blueprint Print

To ensure comparability between the results of the soil and water conservation field trials, a blueprint was developed for all the site implementation plans.

 

Content

  • General: location of the monitoring plots
  • Summary: brief summary of the problems at this particular location and the SWC chosen, summary from Research Theme 3
  • Location description: soil type, relief, climate and photo's of the plot/field area
  • Stakeholder info: name, level of technology applied on this location
  • Land use: crop, rotation, grazing practice etc.
  • Conservation measures and experimental setup: short description of SWC measures, experimental setup, plot layout, situation map
  • Monitoring activities
  • Timetable of activities
  • Analysis strategy

 

More details ... download the full document

iconWP4.1 Site Implementation Plan: blueprint [0.82 MB]

 
fig3-6.jpg.jpg

Acknowledgement

fp6 logo 3 50 x 43
The DESIRE project was 
co-funded by the
European Commission,
Global Change and
Ecosystem.
Contract no: 037046 GOCE

DESIRE brought together the expertise of
26 international research institutes
and non-governmental organisations.

This website does not necessarily
represent the opinion of the
European Commission. The European
Commission is not responsible for
any use that might be made of the
information contained herein.

Citing website content

For the terms under which the content 
of this website may be used see 
»Disclaimer, copyright and privacy

When referenceing page contents
please cite as Brandt, C. J. (ed). 
2012. "page title". DESIRE Project 
Harmonised Information System.
DESIRE Consortium.  
www.desire-his.eu. 

If citing a deliverable use the authors'
names, date and title as given on the 
cover page and add "available at 
www.desire-his.eu".

Follow us